beta
(영문) 대구지방법원김천지원 2020.11.26 2019가단30224

손해배상(기)

Text

1. The Defendants jointly share KRW 88,409,175 with respect to the Plaintiff and the period from February 23, 2018 to November 26, 2020.

Reasons

1. Basic facts

A. The Plaintiff (E) is a person who runs solar power generation business, etc. with the trade name of “F” and “Gumisisisisisi G” as its place of business. 2) Defendant B Co., Ltd. (hereinafter “Defendant B”) and Defendant C Co., Ltd. (hereinafter “Defendant C”) are companies running mother pumps, wholesale and retail business, etc. as their intended business.

The location of the headquarters of Defendant B is “Gu Si H” and the location of the headquarters of Defendant C is “Gu Si I”.

(B) At the time of a fire, the current state and location of the building at the time of the occurrence of the fire (i.e., the physical state) and the road name address related to the lot number address of the land in the Gu and the Gu and the Gu and the Si and the Gu and the Si and the Gu and the Gu and the Gu and the Si and the Gu and the Gu and the Si and the Si and the Si and the Si and the Si and the Si and the Si and the Si and the Si and the Si and the Si and the Si and the Gu and the Si and the Gu and the Si and the Si and the Gu and the Si and the Si and the Gu and the Si and the Si and the Gu and the Si and the Gu and the Si and the Gu and the Gu and

In the above case, two buildings are constructed with "general steel structure panel branch roof factory (ware) 652.68 square meters." The building is divided into "Nho building" and "Oho building" on the building register or building register. The date of approval for use of each of the above factories is November 28, 2002.

(2) The road name address related to the address of the above lot number of the P land in the Gu and America adjacent to the site of the building No. 2 and the building No. 1 and No. 1 and the building No. 1 and the building No. 1 and the building No. 1 and No. 2 are referred to as the “Nho-si G” and this corresponds to the location of the Plaintiff’s place of business.

On the other hand, the building contents are general steel structure, and the Qdong factory building which is the 1,000 square meters of the roof of the panel, and the general steel structure, and the other roof of the panel.