(영문) 수원지방법원 2020.02.06 2019가합2080
공사대금
Text
1. The Defendants shall jointly and severally serve as the Plaintiff KRW 267,273,875 and as a result, from September 27, 2019 to October 14, 2019.
Reasons
1. The description of the claim is as shown in the annexed sheet of claim(s) and “the changed cause of claim(s).”
2. Articles 208 (3) 1 and 257 (1) of the Civil Procedure Act of the applicable provisions of Acts;