(영문) 부산고등법원(창원) 2016.04.07 2015나21359

손해배상(기)

Text

1. Of the judgment of the court of first instance, the part against the defendant exceeding the money ordered to be paid below shall be revoked.

Reasons

1. A claim for damages;

A. The Defendant recognized the Plaintiff around April 2014, at the request of the Plaintiff at KRW 710,00,00 from 10kmW to 70kW of the construction work (hereinafter “electric pressure construction”) at the rate of KRW 10km to the Plaintiff’s electric power of the Korea-do stable operated by the Plaintiff (hereinafter “the Plaintiff”) located in Gyeongnam-gun, Gyeongnam-gun (hereinafter “the Plaintiff”), and the Defendant refers to a processed cable from the neighboring cable to the connection point of the accommodation without undergoing any other support from the support of the processing cable.

This is also called a "processing Seal".

In contrast, "processing Cable" means a ferry installed on the ground to transmit electricity, such as electric poles and steel towers, and it is used without any special distinction with the concept similar to "processing Line".

The term "processing line" means a line installed in the public by means of support, such as electric poles, and supplying electricity.

The replacement part of electric wires up to the connection point is re-entrusted to the Plaintiff’s Intervenor (hereinafter “ Intervenor”) and the construction is completed, and the electric voltage construction is completed by replacing the electric wires from around 09:00 on April 24, 2014 to from the 12:00 on the other part, which is the remainder of the line connection point, to the string measuring instruments.

At the time of the construction, the livestock shed had both a roof and a roof, and the roof of the livestock shed was operated by the electronic opening and closing method, and the plaintiff was raising the livestock in the livestock shed by registering the breeding stock with the Korea Breeding Stock Improvement Association, an incorporated association.

On April 25, 2014, after the completion of the construction of the electric voltage, the front part of the roof, in the course of opening or closing the bridge roof on April 25, 2014, is cut off part of the electric wires by contacting electric wires between the string line connection point and the roof of the stable, and the electricity flowing the cable flows into the stable through the boo roof, with the wind flowing down into the stable, the head is tightly carried between the automatic booming of metal materials within the boom.