beta
(영문) 서울남부지방법원 2020.08.12 2020가단239537

보증금반환

Text

1. The Defendant shall deliver the “Seoul Geumcheon-gu Seoul Building D head” from the Plaintiff at the same time, and at the same time, KRW 50,000,000 to the Plaintiff.

Reasons

1. The description of the grounds for the claim shall be as specified in the attached Form;

2. Judgment without holding any pleadings (Articles 208 (3) 1 and 257 of the Civil Procedure Act);

3. The Plaintiff’s obligation to deliver the leased real estate and the Defendant’s obligation to refund the lease deposit are concurrently performed. The Plaintiff’s claim for damages for delay is dismissed as it is without merit.