손해배상(기)
1. The Defendant’s KRW 54,956,140 as well as 5% per annum from May 18, 2012 to December 18, 2013, and the following.
. On October 19, 201, the Plaintiff, upon the Defendant’s request for the additional order, planned to additionally produce three SF490 products worth KRW 15,740,000 in total (No. 4,11 below) and around that time, issued a new order for the re-revision of the contract amount, etc. (No. 3 evidence; hereinafter “final order”).
No. 1차 발주서 규격(가공치수) 재질 수량 단가 금액 비고 변경사항 1 1-1 495×370×100 A105 8 137,750 1,102,000 2 1-2 1560×975×269 SF490 1 5,888,450 5,888,450 시편 단가 상승 3 1-3 1280×975×1174 SF490 2 16,764,000 33,528,000 4 - 1280×350×435 SF490 1 9,900,000 9,900,000 *추가 발주분 5 1-4 965×700×863 SF540 3 7,079,950 21,239,850 S35C 사용 6 1-5 940×720×110 A105 1 464,000 464,000 7 1-6 1100×720×140 A105 1 1,035,300 1,035,300 8 1-7 720×560×1185 A105 1 4,667,750 4,667,750 9 1-8 1110×600×243 SF490 2 2,295,350 4,590,700 10 1-9 850×600×1173 SF490 4 6,440,900 25,763,600 11 - 850×245×346 SF490 2 2,920,000 5,840,000 *추가 발주분 12 1-10 595×380×858 SF540 5 3,601,950 18,009,750 S35C 사용 기존 6개 중 1개 시편 단가 상승 13 595×380×858 SF540 1 4,869,200 4,869,200 시편 14 1-11 645×455×76 A105 2 329,100 458,200 15 1-12 375×255×450 A105 2 318,200 1,438,400 16 1-13 904×740×100 SF590 1 361,600 361,600 기존 2개 중 1개 시편 단가 상승 17 904×740×100 SF590 1 664,000 664,000 시편 18 1-14 900×670×585 A105 1 3,056,600 3,056,600 기존 2개 중 1개 시편 단가 상승 19 900×670×585 A105 1 3,858,450 3,858,450 시편 20 1-15 670×480×890 A105 2 3,192,900 6,385,800 21 1-16 920×670×90 A105 2 437,900 875,800 22 1-17 850×670×80 A105 2 314,650 629,300 소계 46 154,626,750 ** 발주조건
1. Single specifications (ITP) required to be submitted;
2. Raw materials Murl Set submission network;
3. Submission of the results of fractional materials UT, and/orbrupted network (to be planned to be USER-UT after a search);
4. Sexual records (1EA in the same heat processing process of the same harge) e, heat processing 5, and heat processing separate inspections at the presence of User on the part of the Si.