beta
(영문) 대전지방법원 홍성지원 2015.09.30 2015고정176

산업안전보건법위반

Text

Defendants shall be punished by a fine of KRW 3,000,000.

Defendant

If A does not pay the above fine, it shall be 100.

Reasons

Punishment of the crime

Defendant

A is the field director of the company's neighborhood living facilities and multi-family house construction in Chungcheongnam-gun, Hongsung-gun, a company is a person in charge of the safety and health of his employees, and the defendant B is a corporation established for the purpose of civil engineering work, etc.

1. Defendant A

(a) Where material objects are removed or are in danger of falling off due to work, the business owner shall take measures necessary to prevent danger, such as the installation of protection lines;

Nevertheless, on August 28, 2014, the Defendant did not install a protection team in the main entrance and exit of the first floor of the main building in the main building site at the construction site at the same time.

(b) In a place where workers might fall down, as the end or opening of a work plate and passage, a business owner shall install a strong structure with sufficient strength to take measures for the protection of safety distress, fences, vertical fall-off net, cover, etc. (hereafter in this Article referred to as "turbing, etc.");

Nevertheless, around August 28, 2014, the Defendant did not install a safe bus at the main body of the second floor slab Dong-dong at the construction site.

(c) A business owner shall install a work plate meeting the standards for the place of work, the height of which is at least two meters;

Nevertheless, on August 28, 2014, the Defendant did not install a work plate at the outside vision of the second floor of the main floor at the construction site at the same time.

A business owner shall have contact points in order to prevent the danger of electric shock by means of electric machinery and apparatus connected to and used by code and fluor.

Nevertheless, on August 28, 2014, the Defendant did not enter the temporary installation at the construction site at the same time.

2. The Defendant B, at the time and place specified in paragraph (1), is to prevent the Defendant’s business from falling, falling, falling or flying objects, and from danger by electricity.