(영문) 대구지방법원 경주지원 2017.06.22 2016고단1022

업무상과실치상

Text

Defendant

A A A shall be punished by a fine of 3,000,000 won, and Defendant B shall be punished by the imprisonment without prison labor for eight months.

(2) the date of this judgment.

Reasons

Punishment of the crime

Defendant

B As the head of the factory E, a person in charge of the safety and health management of the above factory as a person in charge of the safety and health management and the general manager of safety and health of the above factory is appointed as the head of the production 2 team team. Defendant A is a person in charge of safety management for workers belonging to the production 2 team team leader, victim F (31), victim G (29) and victim H (28 years old) are employees belonging to the production 2 team group.

Co., Ltd. purchased a steel dust and produced a smoke in the way of extracting a heat from the heat of 1,300 degrees at the temperature of 1,300 degrees at east. In the process of extracting a smoke and discharging the remaining parts (hereinafter “DDR”), the case of blocking the pipes connected with a gold set in which DDR is stored with cooling water, occurred at least 1-2 times a month, and in this case, the problem has been resolved by reducing the DDR of the pipe that the workers directly obstructed by the fluence into a gold set.

In this regard, when workers perform the above work, there was a possibility that the high temperature drI's high temperature dracks the steam of high temperature dracks, and workers are likely to suffer images, and workers have continuously requested to supplement the facilities.

Therefore, although the Defendants knew that workers might suffer from a disaster, such as image, etc. in the process of removing the power force of preventing dubing, the Defendants did not take any particular measure and let workers continue the above work.

Defendant

A around 08:00 on March 26, 2016, around 08:00, adjusted the output of operation at the control tower room of the above company, confirmed whether the rain breakdown occurred, and instructed the victims to search for the pipes that are connected to the rash by DRI while moving the remainder after heating the 1,300 roads at the 1,300 roads at the east and extracting the rain.

In this case, the DDR of high temperature is the cooling number.