건설산업기본법위반
Defendant shall be punished by a fine of KRW 5,000,000.
When the defendant does not pay the above fine, 100,000 won.
Punishment of the crime
The defendant is a person operating C Co., Ltd. in Ulsan Metropolitan City, Nam-gu, 401, and D is a chief of the inspection, "Ein-gu, Chungcheongnam-gu, Chungcheongnam-gu, Chungcheongnam-gu."
Although construction works on construction or substantial repair of a building other than a residential building with a total floor area exceeding 495 square meters should be executed by a constructor registered under the Framework Act on the Construction Industry, the Defendant entered into a contract for the extension of the above D and the above F, a religious facility, on March 16, 2010, in the Dong-gu, Chungcheongnam-gu, Chungcheongnam-gu, Chungcheongnam-gu, Chungcheongnam-gu, Chungcheongnam-gu, Chungcheongnam-do, and the Defendant entered into a contract for the extension of the above D and the above F, a religious facility, and without registration of construction business under the Framework Act on the Construction Industry, and performed a construction work for the extension
Summary of Evidence
1. Defendant's legal statement;
1. Each police statement made to G, D, and H;
1. A written statement of I;
1. A written accusation;
1. Application of Acts and subordinate statutes to a construction contract, business registration certificate, and housing construction business operator registration certificate;
1. Article 96 subparagraph 5 of the Framework Act on the Construction Industry and Article 41 (1) 3 of the same Act concerning criminal facts, the selection of punishment, and the selection of fines;
1. Articles 70 and 69 (2) of the Criminal Act for the detention of a workhouse;
1. Article 334 (1) of the Criminal Procedure Act of the provisional payment order;