beta
(영문) 창원지방법원통영지원 2013.07.26 2011가단13028

소유권이전등기 등

Text

1. The defendant shall be the plaintiff.

(a) In the case of 18 m2 and above D 76 m2, indication of the attached drawings 13, 00 m2, 14, 5, 5, and 10 m2.

Reasons

1. Basic facts

A. On April 30, 1981, the Plaintiff completed the registration of ownership transfer with respect to D large scale 76 square meters on April 30, 1981, and completed the registration of ownership transfer on July 5, 1986 with respect to the above C large scale 18 square meters adjacent to the said land.

(hereinafter referred to as “Plaintiff-owned land”). (b)

Plaintiff

The defendant's father, F, the father of the defendant, completed the registration of transfer of ownership on April 20, 1981 with respect to the above E-ga-267 square meters adjacent to his own land, and the defendant completed the registration of transfer of ownership on May 14, 199 with respect to the above land from F on May 13, 199.

C. Between the land owned by the Plaintiff and the land owned by the Defendant and the land owned by the Defendant, the above G G-34 square meters owned by the State is located.

H constructed a panel building on the ground of 34 square meters in GJ, G, 34 square meters (hereinafter “the instant building”). The instant building was located on the ground of the Plaintiff’s land, and was located on the indication of the attached drawing, 13, 10, 14, 5, 7, 10, 3, 13, 7, 13, 20 square meters of the above building on the ground of 20 square meters of the above 20 square meters of the underground floor. 5, 6, 7, 7, 7, 7, 8, 8, 2 square meters of the part adjacent to each of the above 34 square meters of the above buildings, and 6, 7, 8, 10, 14, 5, 6, 10, 10, 10, 13, 13, 15, 10, 13, 10, 10, 15, 10, 10, 1, 7, 1.

E. The above E-lease 267 square meters, which is owned by the Defendant, is divided into 12 square meters in part of land in the ship (hereinafter “instant land”) and 255 square meters in sequence, which connects the fence to each point of the attached Form 7, 8, 9, 10, 11, and 7 with the boundary of the fence.

F. From June 1, 2011 to December 31, 2011, unjust enrichment equivalent to the rent of 20 square meters among the land owned by the Plaintiff is unjust.