beta
(영문) 제주지방법원 2019.01.24 2017가합267

공사대금

Text

1. The Plaintiff:

A. Defendant B’s KRW 236,967,364 as well as KRW 227,154 as from December 27, 2016.

Reasons

1. Facts of recognition;

A. The Plaintiff and Defendant B’s construction contract, etc. 1) On November 2, 2015, the Plaintiff is a multi-unit housing with a scale of 332 square meters in Jeju-si, Jeju-si (hereinafter “instant building”).

3) The construction project was contracted with a new construction project (hereinafter “instant construction project”) and the said construction project was contracted with the “instant construction project.”

(b) The main points thereof;

Details are as follows:

1. Name of construction: D multi-household/new construction works at Jeju;

2. Amount of a construction contract: 1.275 billion won (excluding value-added tax);

3. Payment method of down payment: Claim for and settlement of each month of payment for completed portion of KRW 160 million.

4. Compensation for delay: 1/100.

5. Construction period: Terms and conditions of contract between November 2, 2015 and July 6, 2016 - the supply of windows shall run by E (designated entity ordering).

- A Dolphone, other than the details, shall be established by the Plaintiff.

- Matters other than the details are separate. 2. The estimate special engineer of the quotation of the instant construction contract is an exception to the construction project, as follows:

1. Deposit for the Korean advance, expenses for the admission for the awarded water, and expenses for the boundary surveying;

2. Charges on sewage charges and fire-fighting supervision charges;

3. Projects for the cutting of base rocks and the removal of soil;

4. Landscaping works (Landscaping, landscaping trees, and planting works);

5. Lighting fixtures and installation costs, and air-conditioning works;

6. Audiop and other works for furnitures;

7. Construction works for fences;

8. Gas works;

9. On January 5, 2016, the Plaintiff: (a) on January 5, 2016, the authorization and permission fee No. 10, 10, 10, 2005, 10, 200, 200, 2005, 200,000,000,000,000

(4) The Plaintiff commenced the instant construction work on November 20, 2015, and Defendant B obtained approval for the use of the instant building on December 27, 2016.

5 The Plaintiff received KRW 1,267,119,311 in total from Defendant B as the construction price of the instant case from December 10, 2015 to January 4, 2017.

B. The Plaintiff’s payment of public charges and air-conditioning fees.