(영문) 창원지방법원 2017.02.15 2016고단1471

수질및수생태계보전에관한법률위반

Text

Defendants shall be punished by a fine of KRW 6,000,000.

Defendant

If A does not pay the above fine, it shall be 100.

Reasons

Punishment of the crime

Defendant

A is the actual manager of corporation B in Kimhae-si F, and the defendant corporation B is a corporation established for the purpose of manufacturing parts of construction machinery.

It is difficult to maintain environmental standards due to water pollutants discharged from discharge facilities in the upper region of the water source protection area, special measures area and the upper region of the special measures area, areas where water intake facilities are installed, and the upper region of the water source protection area, or there is a

The Minister of Environment may not install discharge facilities that discharge specific water-quality harmful substances in an area designated as "area subject to the restriction on the installation of discharge facilities", and a person who intends to install other discharge facilities shall obtain permission from the Minister of Environment as prescribed by Presidential Decree.

1. From November 2014 to March 23, 2016, Defendant A, the Minister of Environment, set up 13 parts of the CNC line 13 cubic line 4.95 cubic meters, and two parts of the annual masts (0.14 cubic meters of the storage capacity of the expropriated water) (0.14 cubic meters of the storage capacity), without obtaining permission for the installation of wastewater discharge facilities, from Defendant B, located in F in Kimhae-si, designated as an area subject to the restriction on the installation of wastewater discharge facilities from the river basin under the river basin, by the Minister of Environment.

2. The Defendant Company B, in relation to the Defendant’s business at the same date and time as in the preceding paragraph, installed 13 parts of the CNC Line Line (4.95 cubic meters of water storage capacity) and 2 parts of the smoke string season (0.14 cubic meters of water storage capacity), without obtaining permission for the installation of wastewater discharge facilities as above, even if the installation of wastewater discharge facilities was restricted by discharging specific water-quality harmful substances more than the standard concentration.

Summary of Evidence

1. Statement by the defendant in court;

1. Written statements, written confirmations of violations, written confirmations of collection of samples, and environmental laws;