(영문) 창원지방법원 통영지원 2015.06.10 2014고단1036

업무상과실치사등

Text

Defendant

A and B shall be punished by a fine of KRW 5,00,00,00,00,00,00,000,00 for each of 10 months.

Defendant

C, D, E above.

Reasons

Criminal facts

On the premise of fact, SP shipbuilding Co., Ltd. is a corporation that employs 1,200 full-time workers at the I, 1,200 staff at the I, SP shipbuilding support team at SPP shipbuilding support team at SP shipbuilding support team at SPPPP team at SP team at SPP team at S, Ha, and Defendant E is a personal business owner who engages in vessel repair and maintenance business with the trade name of 45 full-time workers at the I, J., Defendant E is the representative of Defendant E who exercises overall control over safety and health of J workers; Defendant C is a personal business owner who engages in vessel repair business with the trade name of 20 full-time workers at the I, K, and Defendant B is a mobile type driver belonging to the J, and Defendant B is a general person who has been in charge of the management and operation of the I, such as management and operation of the I, e.g., the I, e., the management and operation of the maritime schedule in the I, as a general manager.

Criminal facts

1. Defendant A and Defendant B

A. From around 08:30 on March 18, 2014, Defendant B instructed the J and K employees to load a portable cler (35.2 tons during the rated) on the barge in order to install two floating plates (29 tons, 31 tons, respectively) for mooring at sea 750 meters away prior to the SP shipbuilding station. Defendant A, who directly driven mobile clers and directly driven the mobile clers on March 18, 2014, moved two floating plates, which were kept in the custody of the PPP shipbuilding station, to the sea be loaded at around 14:30 meters prior to the SPP shipbuilding station, but failed to continue to work due to strong wind, was to temporarily loaded at the PP mooring station at around 18:0 on March 18, 2014.

However, at the time, the strong wind and waves of 13 to 14ms exceeding 10ms, which are the work limitation customs in accordance with the design standard of the above cranes, and there is a white wave inside and outside 1ms, and the 31 ton of heavy objects (31 ton) of the barge due to its weather aggravation, when the crane was loaded on the barge, exceeds the maximum rated load (35.2 ton).