beta
(영문) 전주지방법원남원지원 2014.07.17 2013가합650

공사대금

Text

1. The Defendants are jointly and severally liable to the Plaintiff for KRW 910,00,000 and KRW 310,000,000 among them, from May 25, 2013 to May 2013.

Reasons

1. Facts of recognition;

A. G Agricultural Partnership was established on October 19, 2012 on the grounds of Article 16(1) of the Act on Fostering and Supporting Agricultural and Fisheries Enterprises.

Defendant B, C, and D were members of the farming association of this case since its establishment, and Defendant E and F were members of the farming association of this case on February 25, 2013.

Defendant B was the representative director of the farming cooperative of this case since its establishment.

B. On November 2012, 2012, the Plaintiff received a verbal contract with Defendant B for the filling-up and flating Construction Work (hereinafter “instant construction”) with respect to H 2902 square meters and 77 lots (which were in the form of stairs at that time; hereinafter “instant glass temperature site”) owned by the former head-Gun, which sought to create a favorable temperature complex from Defendant B, and the Plaintiff commenced the instant construction from around that time.

At that time, in an agro-industrial complex site of 181,127 cubic meters of 19258 square meters of forest land owned by Jeonbuk-gun, Jeonbuk-gun (hereinafter “agricultural and industrial complex site”) adjacent to the instant site, it was determined to cut earth equivalent to the 181,127 cubic meters of 181,127 meters and embling it into the instant glass temperature site (the transportation cost is not claimed, but is to be claimed only for banking costs), and thereafter, to additionally cut earth equivalent to the 147,739 cubic meters of 147,739 cubic meters from the subsequent site of the

(c) to charge the cost of transportation and banking costs;

On December 31, 2012, the instant farming cooperative submitted an application for the instant project to support the construction of high-tech greenhouse (new construction area: 67,00 square meters in free temperature rooms, financing plan: 20 billion won in national treasury loans: hereinafter “instant project”).

On February 27, 2013, the head of Si/Gun issued a notice of the selection of persons eligible for the instant project and the determination of budget (business volume: 67,000 square meters, allocated amount: 20 billion won of national treasury loans) to the instant farming cooperative in 2013.

The head of Si/Gun shall select a construction company related to the instant project on February 28, 2013.