(영문) 서울중앙지방법원 2019.05.17 2018가합568981

기술사용료

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Facts of recognition;

(a) Name of the Plaintiff’s patented invention 1: filing date of 32)/registration date/registration number: Claim 4) claims: The 000s ordinarily enter the rocks and provide for inserting air; the 2000s ordinarily enter the rocks and the 2000s where the air is carried out; the 2000s where the air is carried out, and the 30s where the 200s air is installed with any nonvibration crusher equipment in any of the above paragraphs 1 through 3, and the 30s of the construction where the 300s air enters the base half of the rocks; the 10s of nonvibration crushers using the above 4s of construction; the 2000s or more of the base crushers installed in the base half of the construction; the 5s or more of the base crushers installed in the base half of the construction; the 4s or more of the base crushers installed in the base half of the construction; the 3s or more of the base rmos installed in the base.

On September 24, 2015, the Defendant received the following construction contract (hereinafter “instant contract”) from Seoul Special Metropolitan City, and performed the construction work on September 24, 2015.

1. Name of the Corporation: