beta
(영문) 서울중앙지방법원 2016.11.30 2013가단253324

손해배상(산)

Text

1. The Defendants jointly share KRW 77,493,071 as well as 5% per annum from May 3, 2011 to November 30, 2016.

Reasons

1. Basic facts

A. The Korea Highway Corporation awarded a contract for construction works of the FF in Yangyang-gun E in Gangwon-gun to the Defendant Construction Corporation.

B. Defendant Daewoo Construction Co., Ltd. awarded a contract for some of the above construction works that he contracted to Defendant Kuyang Industries Co., Ltd.

C. On January 19, 201, Defendant D, the owner of G Pester (hereinafter “instant route”), leased the instant route to Defendant D, the owner of the G Pester (hereinafter “instant route”), from January 19, 201 to January 18, 2012; the place of use, from Defendant D, the construction site for the mass construction works of the Defendant Gitr Co., Ltd. (hereinafter “instant accident site”); the rent is KRW 950,00 per road; the leased object is KRW 9.5 million per road; the leased object is the log and the route driver; and the Plaintiff and the instant route are the pilot.

From that point of time, the Plaintiff was running the instant log with H who driven another route while driving the instant log at the same construction site. D.

On May 3, 2011, around 12:45, the Plaintiff was engaged in the work to build a spanish by cutting wheels in a middle spane and in accordance with the direction of Defendant C at the above site.

However, the Plaintiff’s head was demoted while sprinking between the above typing and the wheel chairs without showing air pressure, and the Plaintiff’s head was faced again with the head of the rode (hereinafter “instant accident”).

As a result, the Plaintiff suffered from an open brupted brush, a credit-free brush, a credit-free brush, a credit-free brush, analvated brush, and analvance of the inner part.

E. Defendant C is the husband of Defendant D, and the owner of the instant log, but in fact, while managing the instant log, Defendant C was the Defendant C, who employed the Plaintiff as a prospective driver and gave instructions related to the operation of the log to the Plaintiff.

[Reasons for Recognition] Unsatisfy, Gap evidence 1 to 3, and 28 (including branch numbers; hereinafter the same shall apply).