(영문) 서울고등법원 2017.11.08 2016누31380

시정명령및과징금납부명령취소

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

On July 20, 2015, the Defendant made a decision.

Reasons

Basic Facts

Plaintiff

The Plaintiff’s status as the Plaintiff, 20 Heavy Industries Co., Ltd. (hereinafter “stock company” in its trade name is omitted), Samsung C&T, KS construction, Hyundai Heavy Industries, C&T, C&T, C&T, Q&T, treatment construction, z. construction, gold industry, Hanyang, Hanyang Construction (hereinafter “existing 12 copies”) constitutes a business entity under Article 2 subparag. 1 of the Monopoly Regulation and Fair Trade Act (hereinafter “Fair Trade Act”) as a person engaged in construction business, and a new comprehensive construction (hereinafter “2 companies, including the Plaintiff, etc.”), under Article 2 subparag. 1 of the Monopoly Regulation and Fair Trade Act.

On January 10, 2017, 2013 2014, Plaintiffs 557, 273, 17, 386, 959 566, 960 569, 6445, 696, 697, the Plaintiff’s general status (base: the end of 2014, unit: KRW 00,000) on January 10, 2017, as follows:

Domestic natural gas business that combines the bid documentation for natural gas main pipelines and management stations with the construction works of the Korea Gas Corporation is a structure in which the Korea Gas Corporation, a wholesaler, imports in the state of liquefied natural gas (LNG) from the place of origin overseas, re-satizes it, and supplies urban gas company, a large-scale consumer, and a retailer in the country, to gas company, a retailer, supplies gas company to general consumers such as household and industry.

Main pipes and control stations are supply facilities installed and operated by the Korea Gas Corporation to supply natural gas to power plants and urban gas companies.

Among them, main pipes refer to underground pipelines that supply high-tension natural gas made at the production base for stable gas supply to the natural gas supply source to the supply point.

The management office requires natural gas transported by high-tension through pipes at the demand source.