손해배상(국)
1. Of the judgment of the first instance, the part against Plaintiff A and B, including the claim extended by Plaintiff A and B in this court.
Basic Facts
Plaintiff
A’s father and mother of the deceased I (hereinafter “the deceased”), the Plaintiff B’s mother, the Plaintiff C’s son’s son, the Plaintiff D’s urine’s outer urine of the deceased, the Plaintiff E, F, and G’s son’s son’s son, and the Plaintiff H’s son’s external son’s son.
The defendant owns the building and site of the K agency in Kimcheon-siJ, and has a place of business under its jurisdiction to provide the said K agency with planning performance, exhibition, rental, events, etc. for the citizens of Kimcheon-si while operating and operating the said K agency.
On September 7, 2018, the foregoing K K K performance hall (hereinafter “the instant performance hall”) was scheduled to hold a “N” performance held by the Defendant and the RR Committee, an incorporated association M and L Federation (hereinafter “N” performance of this case”).
On September 6, 2018, the Deceased, an incorporated association M, was employed as a string of the above performances, and was engaged in the tsheling of the stage sets at the performance hall of this case in order to prepare a public performance on the following day:10 on September 6, 2018.
In the above stage, a set of feet (hereinafter “instant set”) that can be lowered up to 6.5 meters was established at the center, but the Defendant’s O of the Defendant, a stage supervisor of the K K agency, is a class 7 public official in charge of the operation, maintenance, repair, exhibition, division, and practice room management of the K agency’s stage supervisor.
Around 13:18 on the same day, the machines supervisor P had the instant lifts p in order to put the stage sets and equipment under the stage, and as a result, there were 78 square meters in size (13 meters in width, 6 meters in length) at the stage in which the deceased was on duty.
In order to verify the work results of a stage 13:23 square meters in light of the above work, the Deceased died of the above opening 6.5m from the floor below the 6.5m. On September 10, 2018, the Deceased died due to the external scarcity, external scarcity, external scarcity, and external scarcity, etc. (hereinafter “the instant case”).