(영문) 울산지방법원 2017.03.30 2015고단3337

공문서위조등

Text

A defendant shall be punished by imprisonment for not more than ten months.

Reasons

Punishment of the crime

On October 2, 2014, the Defendant was sentenced to imprisonment with prison labor for six months at the Ulsan District Court, and the sentence became final and conclusive on June 13, 2015.

[2015 Highest 3337] The Defendant: (a) was a person operating “C” located in Ulsan-gu, Ulsan-gu; (b) was entrusted with warehouse construction on October 15, 2014 with D as to “Ulsan-gun E, Ulsan-gun and one lot of orchard”; (c) entered into a contract for construction with D; and (d) thereafter, performed warehouse construction on the said land from that time.

The defendant arbitrarily altered the design drawings in the name of F architect office, which was kept for the purpose of using them in the construction of the above orchard warehouse, and thought to arbitrarily prepare a notice of the receipt of the building report in the name of Ulsan-gun.

1. On October 15, 2014 through around 20, the Defendant changed a private road, at the office located in Ulsan-gu, Ulsan-gu, Seoul-gu, “C” (hereinafter “UD”), and the facts were: (a) requested a F architect office to design the design of the said warehouse construction; or (b) did not consent to the preparation of the design plan under the name of the said office; (c) instead of being approved by the said office, the design under the name of the F architect office used in the “G neighboring Living Facilities Construction Works” (hereinafter “G neighboring Living Facilities Construction Works”); and (d) drafted the design plan at his/her discretion.

Accordingly, for the purpose of uttering, the Defendant modified a copy of the “new construction of HH warehouse in Ulsan-gun,” under the name of F architect office, a private document on rights and obligations.

2. On December 2014, the Defendant provided the said design drawings to D, a building owner, at the end of the daylight.

Accordingly, the Defendant, as seen above, exercised a copy of the “new construction of a warehouse in the name of the F architect office under the name of the F architect office, a private road for rights and obligations altered.”

3. On December 2014, the Defendant forged an official document: (a) at the office of the above “C” on the date of the first order of 12:00,00, the title “1. A person who is permitted to receive a report on construction” by using a computer, and (b) “A notice of receipt of a report on construction: Ulsan-gun E and one parcel, respectively;

2. Location: commercial Dong;

3. Area: