beta
(영문) 청주지방법원 2015.12.23 2015가단13492

건물명도 등

Text

1. The defendant shall be the plaintiff.

(a) The Heak-gu Cheongju, the Heak-gu, the Heak-gu, Osansan-ri 332-2, the general steel structure sand site board.

Reasons

1. Indication of claims: To be as specified in attached Form 1;

Attached Form

The buildings indicated in the list are 30.33 square meters in the second class neighborhood living facilities in the middle class of the Cheongju-gu Cheongsan-gu Masan-ri, Osansan-ri 332-2 of the general steel structure sandllllll site, one of which is the second class neighborhood living facilities.

2. Judgment by public notice: Article 208 (3) 3 of the Civil Procedure Act.