(영문) 대구지방법원포항지원 2017.08.08 2016가단100438

토지인도

Text

1. The defendant shall be the plaintiff.

A. Of the real estate listed in paragraph 3 of the attached list, the Attached Form Nos. 79, 80, 81, 82, and 79 shall apply.

Reasons

1. Facts of recognition;

A. On January 3, 1996, the Plaintiff entered into a lease agreement (hereinafter “instant lease agreement”) with the Defendant on the following terms and conditions as the owner of each of the lands listed in the separate sheet Nos. 1 through 4 (hereinafter “each of the instant lands”) and each of the items listed in the separate sheet No. 79, 80, 81, 82, and 79, which successively connected each of the items listed in the separate sheet No. 79, 80, 82, and 79, among the lands listed in the separate sheet No. 3.

Lease contract

1. Indication Address of Property: The following provisions shall be applied to the use of the property above Article 1 in the house at the risk of brick stringing on the 50 square meters of the site and the 10th building structures and uses:

The total amount of proceeds: Article 2 of the Lee million (one-year user fee) shall be stipulated on January 3, 1996.

Article 3 The term of lease shall be from January 3, 1996 to December 31, 1999.

Article 5 The defendant shall not alter the structure of property at will without the consent of the plaintiff.

Special Agreement

1. A person may cultivate fruit trees;

(Extending existing orchards)

2. Dual storage;

3. The rent for the year 96 shall be appropriated for the repair expenses of the building;

B. After the conclusion of the instant lease agreement, the Defendant newly constructed a large warehouse (hereinafter referred to as “the instant portion”) 37 square meters (hereinafter referred to as “the instant portion”) in sequence with each point of 30,31,32,33, and 30 square meters in the part inside the ship connected with each point of 26, 27, 28, 29, and 26, on the land indicated in the attached Table No. 1 of the attached Table No. 1 of the attached Table, and newly constructed a new warehouse (hereinafter referred to as “the instant portion”) in order to connect each point of 30,31,32,33, and 30,000 in the attached Table No. 34,35, 36, 37, and 34, which connect each point of 37,000 square meters in the attached Table No. 2 of the attached Table No. 38,39,40, 41, and 338,000”).