손해배상
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
1. Basic facts
A. In around 2004, the Plaintiff, according to an agreement between South and North Korea, has moved into the Gsung Industrial District, which was developed and created in the GIC region in the GIC region of North Korea, and has operated the manufacturing business of a kitchen in the 3,738.87 square meters of the steel-frame 2-story factory building located in the said zone B (hereinafter “instant factory”).
B. On December 24, 2010, around 01:30 on December 24, 2010, at the second-story container used as an escape room in the instant factory, the workers set away from the factory by setting on the electric design board, and the fire was caused by the heating of the electric design board.
(hereinafter “instant fire”). C.
At around 02:20, the security guards of the factory of this case reported a fire to the fire station within the Geong Industrial District (hereinafter “the fire station of this case”) located far away from 500 meters in the factory of this case. At the same time, one fire station in South Korea, nine North fire fighters in North Korea, and nine fire fighters in North Korea, who were reported a fire, moved fire command vehicles, fire pumps (3,500liters), fire-fighting tank vehicles (10,000liters) to the fire site, and fire-fighting activities were completely extinguishing around 08:00 on December 24, 2010, but in the process, most of the machinery installed within the factory with two floors, 1,908 square meters in total and one 150 square meters in a part of a 150 square meter attached to the factory of this case, and most of the finished products, finished products, finished products, and original materials were loaded.
[Ground of recognition] Facts without dispute, Gap 1 through 4 evidence, Eul 1, 3, 4, 9 evidence (including each number; hereinafter the same shall apply), the purport of the whole pleadings
2. Summary of the plaintiff's assertion
A. Installation, management, and supervision of fire-fighting systems in the Gisung Industrial District are the duties of the management department of the Gisung Industrial District Management Committee established under the Gisung Industrial District Support Act (hereinafter “Gisung Industrial District Act”), and the Gisung Industrial Support Foundation established under the Gisung Industrial District Act also takes charge of the duties of supervising the said committee, and the Minister of Unification is authorized to direct and supervise the said committee and foundation through the Inter-Korean Cooperation Zone Development Planning Group under the Ministry of Unification.