구상금
1. The plaintiff's appeal is dismissed.
2. The costs of appeal shall be borne by the Plaintiff.
Purport of claim and appeal
The first instance court.
1. Basic facts
A. 1 Status of the Parties
C) The Corporation shall have the right to extend the ground factory D from the Gyeongbuk-gun Corporation (hereinafter referred to as “instant Corporation”).
(2) The Plaintiff is a person who engages in wholesale business and removal business, such as scrap iron, with the trade name “F” in Daegu-gu E.
3) As of November 3, 2010, the Defendant registered a business as F’s business owner, but closed the said place of business on February 22, 201, and registered a business as F’s business owner on April 11, 2011, and subsequently closed the said place of business on February 11, 2014. (B) In the event of G’s accident, it was a person who again closed the said place of business on February 11, 2014. (B) In order to perform the instant construction work, it was necessary to remove two existing building, which is a steel structure, to perform the instant construction. On November 18, 2010, the Dobong integrated construction requested the Plaintiff to remove the building (hereinafter “instant building”).
2) In order to remove the instant building, steel cutting is necessary, and the Plaintiff requested G capable of cutting steel cutting to remove the instant building. 3) G around November 19, 2010, around 11:00, at approximately 3 meters of the height of the instant building, at a level of removal of about 2/3th of the instant building from the 2/3th of the said building, and the steel-frame structure was collapsed due to the collapse of the steel-frame structure by cutting steel-frame structure using a oxygen cutting machine, thereby causing injury, such as acute thromatic herothothopsis, cerebral hemopsis, cerebral hemal hemopsis, and she suffered injury.
(hereinafter “instant accident”).
C. Relevant litigation G filed a lawsuit against the Defendant for damages (hereinafter “related lawsuit”) at the Daegu District Court Branch Branch of District Court 2012Gadan33260 (hereinafter “Seoul District Court”) on February 13, 2014, the amount calculated by the said court at the rate of 5% per annum from November 19, 2010 to February 13, 2014 and 20% per annum from the following day to the day of complete payment.