beta
(영문) 서울동부지방법원 2015.12.24 2014가단131387

구상금

Text

1. The Defendant’s KRW 73,971,90 for the Plaintiff and its 20% per annum from November 11, 2014 to September 30, 2015.

Reasons

1. Facts of recognition;

A. On August 2010, the Defendant awarded a contract to the Plaintiff for a new construction work for Class I neighborhood living facilities and multi-household housing (No. 201, 202, 301, 302, 401, 402, and 501) of the Songpa-gu Seoul Metropolitan Government instant concrete structure. The relevant content among the contract and specifications made between the Plaintiff and the Defendant at the time is as follows.

1) Contract scale: 1st floor of underground septic tanks, 5th floor, and 116.8 square meters: 420.9 square meters in total floor area of 127.32 square meters in 427 square meters in 127 square meters: Value of supply in 3,50,000 square meters in 127 square meters in 127 square meters in : 44,500,000 additional taxes: 10 percent in 10 percent in 10 percent in 1st and 50 percent in 2nd in 2010 to 31 December 31, 2010 in 200 in 200 square meters in 200 square meters in 202.

The 5th floor of extended construction (the same as the 2nd floor, the 4th floor, the same as the 2nd and the 3th floor) shall be constructed after completion and shall be desired by the defendant.

(3,700 x 3,900). (b)

After the design change in August 2010, the exclusive use area of the above building 201, 301 is 73.16 square meters for each building, 28.6 square meters for the exclusive use area of 401, and 502 or 601 square meters for the exclusive use area of 12.6 square meters for 501, and the exclusive use area of 502 square meters for 502 square meters for 13,500,000 won for the additional construction of 502, and 601 additional construction, respectively, was awarded to the Plaintiff after the contract was concluded.

On December 31, 2010, the Plaintiff completed the original contracted construction and additional construction work. Of 201, 301, and 401 of the above building, part of 7 square meters and 501 of the 7th and 501 of the above building was constructed as the studio ridge, and the cost required for the construction with the reinforcement floor is KRW 98,00 per square meter.

C. Meanwhile, the Plaintiff is obliged to pay the gas fee of KRW 130,800 until June 28, 2010, and the same year.

6. The electricity rates of 58,920 won until 19. The same year.

6. 25. Water rates of 14,080 won and the same year.

6. From 35,480 to 28.29 to 35,280 to 35,480 to 239,280 to pay for the Defendant and lend it to the Defendant.

The plaintiff is the defendant's representative D, and 1,000,000 won on September 19, 2010 and October 5 of the same year, respectively.