beta
(영문) 의정부지방법원고양지원 2016.09.21 2015가합75452

건물명도

Text

1. The Plaintiff:

A. The defendant Heavy Heavy Co., Ltd shall deliver each land listed in paragraphs 1 and 2 of the attached Table 1 and B.

Reasons

1. Determination as to the cause of claim

(a) On April 25, 200, the plaintiff filed a claim for India, removal, and removal, and the purport of the above 20-year increase of KRW 5,312 square meters (which was divided into each land listed in separate Tables 1 and 2 around October 15, 2009) for the defendant Heavy Co., Ltd. (hereinafter referred to as the "Defendant Heavy Co., Ltd"), 3,755 square meters (which was divided into each land listed in separate Tables 3 and 40 around October 15, 2009) for 10-year increase of KRW 20,000, KRW 30-year increase of KRW 10,000 for each of the above 20-year increase of KRW 10,000, KRW 200, KRW 100,000 for each of the above 20-year increase of KRW 20,0000, KRW 300,000 for each of the above 20-year increase of KRW 10.