업무상과실치사
Defendant shall be punished by a fine of seven million won.
If the defendant does not pay the above fine, KRW 100,000.
Punishment of the crime
The Defendant is an agent for the technical diagnosis of the vice governor of the D Corporation. On the other hand, E, a stock company, the construction of the overall water distribution among the “G facility construction,” which is in progress in the F of the Gyeongcheon-gun, Chungcheongnam-gun, and requested the vice governor of the D Corporation to conduct a safety inspection prior to the overall use of water distribution for the overall quality inspection. Accordingly, the Defendant received a distribution of the entire water distribution inspection from the above construction site and received a subsidy from the former officially certified victim I (the age 49, south) who supplied the entire water distribution to E on August 7, 2014.
Since the above inspection site is in danger by electric shock, the defendant has a duty of care to provide safety education to inspectors to ensure the safety of human life while taking charge of electric inspection work on the whole water course, and to check necessary safety management matters, and to those who conduct inspections so that safe working environment can be created as part of the inspection site, they have a duty of care to take all safety measures, such as wearing an adequate protective gear, such as a cooling lock, checking a charging book, and conducting inspections.
Nevertheless, the defendant neglected the above duty of care and caused the victim to work without taking measures to prevent danger caused by electric shock, such as failing to conduct the safety education needed for the victim, and not verifying the wearing of a protective gear for smoke. On the same day, the defendant's failure to wear a protective gear for smoke to assist the defendant's work at the above construction site at around 15:22 on the same day and failing to wear a protective gear for smoke that has carried on an electric test while assisting the defendant's work at the above construction site at around 15:22 on the same day, the defendant's left hand at the charging charging 3,300 V where electricity flows at voltage 17:01 on the same day.