(영문) 부산지방법원 2015.08.13 2014가합49008

손해배상(기)

Text

1. The Defendant: 15,00,000 won for Plaintiff A; 1,000,000 won for Plaintiff B, Plaintiff C, Plaintiff D, and Plaintiff E; and each of them.

Reasons

1. Facts of recognition;

A. The parties 1) The defendant was established at K on October 17, 1969 and was converted into L corporation on February 23, 197 and then changed to the current trade name on December 29, 199 after conversion into L corporation on February 23, 199, and was changed to the current trade name on October 196, and the Busan Dong-gu M (hereinafter the same shall apply) in Busan around October 1969.

) Factories producing asbestos products on the N’s ground (hereinafter “instant asbestos plant”).

(2) From February 9 to May 8, 1978, the Plaintiff newly built the asbestos plant in this case, manufactured asbestos products, such as asbestos yarn, asbestos capture, asbestos tape, and asbestos log, and closed the asbestos plant in this case on March 26, 1990. After that, the asbestos plant in this case was moved to the mass acid and was suspended from manufacturing asbestos products until the end of 2006. (2) The Plaintiff resided in the Busan Eastdong-guO located at a distance of 0.3km from the asbestos plant in this case for about six years from February 9, 1972 to May 8, 1978.

Plaintiff

B, Plaintiff C, Plaintiff D, and Plaintiff E are both Plaintiff A’s children.

3) From September 4, 1987, until March 26, 1990, the date of the closure of the asbestos factory of this case, Plaintiff F resided at the 0.1km away from the asbestos factory of this case. On September 4, 1987, the number transfer date of the plant, the number transfer date of which was located at the 0.1km away from the asbestos factory of this case. On October 26, 1989, the number transfer date of which was 14 workers of this case, the number of asbestos transfer date was 20,000 workers of this case, the number of asbestos transfer date of which was 14 workers of this case, the number of asbestos transfer date of which was 20,000 workers of this case. The number of asbestos transfer factory of this case was 20,000 workers of this case and 14 workers of this case, and the number of asbestos transfer date was 14 workers of this case.

2 The defendant produced asbestos products from December 1969 to March 26, 1990 in the asbestos plant of this case, and between them, the asbestos plant of this case is located.