beta
(영문) 서울남부지방법원 2017.04.27 2016가단265225

건물명도

Text

1. The defendant shall give order to the plaintiff each point of indication 1, 2, 3, 4, and 1 of the annexed drawings among the branch floors of the building listed in the annexed list.

Reasons

1. The cause of the claim is as shown in the annexed sheet;

2. Article 208 (3) 3 of the Civil Procedure Act: