beta
(영문) 창원지방법원 진주지원 2021.01.27 2019가단6566

건물철거 등

Text

The Defendants, as the Plaintiff:

A. The phrase “final equity” as indicated in the same list among the real estate listed in the attached Table (1) refers respectively.

Reasons

1. Facts of recognition;

(a) The net L is referred to the network M (1 South) and the network N (3 South) and the networkO is a child of the network M, and the network P is a child of the network N;

B. The Plaintiff, Q and R are children of the networkO.

(c)

Defendant B, C, D, E, F, G, and H are the children of the network P, and Defendant I and J are the children of the network S, which are the children of the network P.

(d)

The deceased L, on September 30, 1914, was under the circumstances of 551 square meters (hereinafter “instant land”) in South-Namnam-gun, Chungcheongnam-do, and was living on the ground, and then died on November 21, 1941.

E. On December 17, 1984, the NetworkO completed the registration for the preservation of ownership on the instant land. On March 29, 2007, the Plaintiff, Q and R completed the registration for the transfer of ownership on March 23, 200 with respect to each of the instant 1/3 shares out of the instant land, and the Plaintiff completed the registration for the transfer of ownership on March 23, 200. The Plaintiff received the gift of the said Q and R shares on August 26, 2019 and completed the registration for the transfer of shares on the same day.

F. The instant house is unregistered buildings, whose ownership is net P in the building ledger, and the approval date of use is written on March 1, 190.

(g) The net P shall have 16 square meters (hereinafter referred to as "part 1") of cement block structure 16 square meters in succession with the indication of drawings 1,2,3,4, and 10 on the ground of the instant land, and shall have 50 square meters (hereinafter referred to as "part 5,6,7,8,9,000 square meters in succession with the indication of drawings 5,6,7,8,9,500 square meters in the ship (hereinafter referred to as "bbb) of cement brick slved housing (hereinafter referred to as "part 50 square meters in the ship") connected with each of the items in the order of 10,11,12,13, and 10 on the ground of the instant land, and shall have 10,000 square meters of cement block structure 4,000 square meters (hereinafter referred to as "cater 4,000 square meters in the ship"), and shall have 17,000 square meters of cement block 14,174,17,15 m2.

[Reasons for Recognition] There is no dispute;