(영문) 창원지방법원 2016.08.23 2014가단28698

공탁금출급권자확인

Text

1. 24,767,243 won out of 87,840,830 won deposited by Changwon District Court No. 755 in 2014, Feb. 24, 2014.

Reasons

1. The following facts can be acknowledged in full view of the following facts: (a) there is no dispute between the parties; or (b) the statement in Gap 1 to 6; and (c) the fact inquiry results with respect to the smuggling market in this court.

The Plaintiffs and Defendant Kudong Construction Co., Ltd. (hereinafter “Defendant Kudong Construction Co., Ltd.”) concluded a subcontract agreement between the Plaintiffs and Defendant Kudong Construction Co., Ltd. on July 19, 2013.

(2) The order of the head of the Sinyang-si shall be the order of the head of the Sinyang-si (hereinafter referred to as the “instant flood restoration”).

Of the construction work, the Doing Basic Work was subcontracted in KRW 53,900,00 for the price for the Doing Basic Work, KRW 15,400,00 for the price for the Doing Basic Work, and KRW 15,400,00 for the Doing Additional Work was finally executed on September 16, 2013, and the Doing Doing Basic Work was finally executed on a contract with Defendant Kukdong Construction with the amount of KRW 70,349,00 for the Doing Basic Work, KRW 22,308,00 for the Doing Basic Work, and completed the construction work, but only the remainder of KRW 40,657,00 among the construction cost was paid KRW 50,00 for the Doing Basic Work, KRW 30,00 for the Doing Basic Work, KRW 300,000 for the Doing Basic Work, and KRW 30,000 for the Doing 20130,20137.

3. Around May 1, 2013, the Plaintiff’s Seoul General Facilities entered into a contract with Defendant Kukdong case to accept the said mechanical and installation installation cost of KRW 137,50,000, and completed the construction work on May 15, 2013, which was finally awarded a subcontract for the said installation installation cost of KRW 170,851,000, among the construction cost.