beta
(영문) 인천지방법원 2020.11.25 2018가단234916

손해배상(기)

Text

1. The Defendants jointly share KRW 19,584,546 with respect to the Plaintiff, and the period from August 3, 2017 to November 25, 2020.

Reasons

1. Basic facts

A. Defendant B, while operating a private house in Gyeonggi-gun D D, was engaged in the business of lending leisure watercrafts, such as Baba, ground bean, bafer (four knife, knife, knife, knife, knife, and knife on both sides), and Defendant C’s knife.

B. On August 3, 2017, Defendant B lent a parter to Plaintiff B, who visited the private boat operated by Defendant B, and Defendant C connected the parter to the power boat around 19:00 on August 3, 2017, and operated a power boat by having the Plaintiff et al. board.

C. As above, when Defendant C had a motor boat connected to the motor boat and driven the motor boat, there was no knife connected to the motor boat, and there was no safety prevention expenses other than the knife. As such, the driver of the motor boat with the passengers aboard the knife was negligent in failing to pay attention to the duty of preventing the passengers from falling off from the knife of the knife, while the driver of the motor boat with the passengers aboard the knife was negligent in sending the knife immediately to the knife without rapid and stable operation of the motor boat, and the motor boat driver of the motor boat with the driver’s knife knife by allowing the knife to run a large water knife generated by the motor boat, thereby making the knife to run the knife on the motor boat.

(hereinafter “instant accident”). D.

In the instant accident, the Plaintiff was judged to have suffered from the injury to the left-hand edge of the instant body (hereinafter “the instant injury”) and the need for the operation of the said aggregate by X-ray diagnosis at the National Armed Forces Open Hospital. After receiving first aid from the F Hospital, the Plaintiff was hospitalized in G Hospital on August 4, 2017 in the vicinity of his/her residence, and was discharged on August 18, 2017, after receiving a metal fixed operation on the aggregate as of August 7, 2017.

Since then, the Plaintiff received rehabilitation treatment, etc. from the above G hospital, H rehabilitation medical hospital, etc. through the hospital, etc. on August 1, 2018.