beta
(영문) 대구지방법원 2020.04.08 2019나316555

손해배상(기)

Text

1. The plaintiff (appointed party)'s appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff (Appointed Party).

Reasons

1. Basic facts

A. The Plaintiff and the designated parties are those running accommodation business with the trade name of “Del (Del)” (hereinafter “instant building”).

B. On January 30, 2019: (a) around 5:00 to 6:00, the Plaintiff discovered that the alteration of the reception room of the first floor of the instant building did not get out of water; and (b) sought drilling with an drilling device, but did not properly have been carried out.

Around that time, the number of guest rooms on the 1st floor of the instant building was the same phenomenon, and the number of guest rooms on the 1st floor E, F, G, and Hhos moved to another guest room.

On January 30, 2019, the Plaintiff discovered water leakages from the drainage pipes of the heart boiler room in the underground room of the instant building, in order to resolve the above problems, at around 11:00.

(hereinafter referred to as “instant accident” by aggregating power and underground water leakage in each guest room.

On January 30, 2019, the Plaintiff discovered that sewage is discharged from sewage collection and sewage pipes, while inspecting pipes with employees of the company specializing in water leakage detection at around 12:00.

E. On February 1, 2019, the Plaintiff filed a civil petition on February 1, 2019, which made phone call to the Defendant’s water supply and sewerage department for smooth circulation of sewage pipes.

Accordingly, public officials belonging to the defendant visited the building of this case at around 1:00 p.m. on the same day and confirmed that water leakage occurred from the drainage pipes of the core boiler room in the underground room.

Then, while the public officials belonging to the defendant check the neighboring sewage pipelines and their accessory facilities outside of the building of this case in sequence, they removed foreign substances that were located in the Mandemania by discovering foreign substances, such as oil, etc. from the 227ms away from the building of this case, and by carrying out washing and removal of foreign substances through high voltage gas sprayers using dredging vehicles.

The next 39th buildings of this case are the buildings of this case through B.