(영문) 대전고등법원 2019.07.10 2018나13781

기타(금전)

Text

1. The plaintiff's appeal and the conjunctive claim added in the trial are all dismissed.

2. After an appeal is filed.

Reasons

1. Basic facts

4. Scheduled date of commencement: The scheduled date of completion of construction on December 10, 2015: The period of construction supervision on December 10, 2015 under the Housing Act (Act on the Maintenance and Improvement of Urban Areas and Dwelling Conditions for Residents): 1,64,00,000 won (excluding value-added tax): the contract amount on December 10, 2015: 1,664,000 won: the base date of the scheduled date of commencement of construction: the contract period of 13. The period of contract: 24 months from the date of commencement (scheduled: December 10, 2013 to December 9, 2015) - the contract term of housing construction supervision services - the scope of housing construction supervision services under Article 2 (Scope of Housing Construction Services) shall apply to the performance of construction supervision services of housing construction works after obtaining approval for a project plan under Article 24 of the Housing Act;

(1) A supervisor shall perform basic duties and perform special duties at the request of a project proprietor, as prescribed by the terms and conditions of the contract for housing construction work supervision services.

(2) The term "basic duties" means the following duties:

1. Examining the appropriateness of the construction plan, process schedule and design documents;

2. Examining and verifying whether the constructor executes the construction work in conformity with the design documents;

3. Review and confirmation of matters concerning the location, specification, etc. of a structure;

4. Examining and verifying the suitability of materials used;

5. Planning, execution guidance, and review and confirmation of the results of testing for quality control;

6. Examining and verifying the level of execution of water leakage, soundproofing, and insulations;

7. Safety management in the prevention of disasters and execution of works;

8. Verification of the suitability of design documents with respect to the relevant topography and the propriety of design changes;

11. All supervisory duties arising from balcony expansion works; 12. Other supervisory duties prescribed by relevant Acts and subordinate statutes, such as various reports, inspections, tests, quality confirmations, and reports pertaining thereto.