채무부존재확인
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Basic Facts
The plaintiff is a company with the objective of soil quality, foundation, research, and analysis service business, and the defendant is a corporation established under the Korea Electric Power Corporation Act for the purpose of power generation, transmission, transformation, distribution, and other related businesses.
around 08:30 on July 30, 2016, the Plaintiff’s employees preparing the instant accident and the confirmation document shall display signs on the surface of the road to inform the Defendant that electric wires are buried underground in the line sign board (electric sign board) installed on the surface of the road. During the process of astronomical work in neighboring areas, the Plaintiff’s employees: (a) destroyed the electric transmission line (hereinafter “the instant transmission line”) 154,005 (154KV) which passes inside the power outlet; and (b) installed the transmission line (hereinafter “the instant transmission line”).
(hereinafter “instant accident”). The Plaintiff’s representative director C prepared and issued a written confirmation (hereinafter “instant confirmation”) as follows to the Defendant on the same day:
A The Korea Electric Power D Co., Ltd. shall recognize the damage to the Han-gu Electric Power Center (including electric cables) in the course of the geological survey of E-A.
I accept this payment of the restoration expenses under this subsection.
(B) In addition, it shall be deposited on the date of designation of the Republic of Korea. 1. Materials: The emergency materials (a cable and connection materials) shall be used.
(Inventory 464m-First of all, emergency materials used shall be purchased in the same quantity and secured as emergency materials. (The remaining cables except 380m in length of the section shall be discarded)
2. Labor cost: Cost of removal and new construction within 380 meters in length of a section;
3. Other expenses, general management expenses, profits, etc. shall be governed by the Acts governing contracts to which the State is a party.
4. The cost of repairing the parts of electric appliances shall be calculated separately;
5. The approximate cost of the construction project is approximately the amount required.