beta
(영문) 광주지방법원 2015.10.08 2014가합58100

보험계약무효확인 등

Text

1. All of the plaintiff's claims are dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. On June 9, 2009, Green Damage Insurance Co., Ltd. (hereinafter “Green Damage Insurance”) entered into an insurance contract with the Defendant as the insured (hereinafter “instant insurance contract”). On May 3, 2013, the Plaintiff was transferred the status of such Green Damage Insurance under the insurance contract by the ruling of the Financial Services Commission on May 3, 2013.

B. From June 11, 2009 to June 24, 2009, the Defendant, after entering into the instant insurance contract, was hospitalized for 437 days in total from June 11, 2009 to June 24, 2009, as indicated in the following table, under the name of “the base and tension of the bones, chrogate, chrogate, and tension of the verte,” the Defendant received hospitalized treatment for 14 days.

(2) 1: (a) 1 B; (b) 1. 2; (c) 1; (d) 1; (d) 1; (e) 1; (f) 1; (f) 2; (f) 1; (f) 1; (f) 1; (f) 1; (f) 1; (c) 1; (f) 1; (f) 1; (f) 1; (f) 1; (f) 1; (f) 2; (f) 1; (f) 1; (f) 1; (f) 1; (c) 1; (f) 1; (f) 1; (f) 1; (f) ; (f) 2; (f) 1; (f) 1; (f) 2; (f) 1; (f) 1; (f) 1; (f) 2; (f) 1; (f) 1; (f) 2); (f) 3; and (f) 2); (f) 1);