beta
(영문) 의정부지방법원고양지원 2020.02.27 2019가단74207

건물명도(인도)

Text

1. The Defendants are to the Plaintiff:

(a) deliver the buildings listed in the separate sheet;

B. Jointly, from December 3, 2018 to October 2019.

Reasons

1. Basic facts

A. The 18 generation residents of the G and H ground I buildings in Seoul Special Metropolitan City, Nowon-gu and Seoul Special Metropolitan City, including the Plaintiff (hereinafter “instant reconstruction project group”), concluded a reconstruction project construction agreement with Nonparty J Co., Ltd. (former K Co., Ltd.; hereinafter “K”) and the 18 household units of the existing I building to 35 households (L building) around March 2016.

At the time, the representative of K was M, but the actual operator was the auditor and the father of M.

N on June 30, 2017, the N actually operated K until the O serves as the representative director.

B. Around August 2016, some of the original residents of the IO building did not want to participate in the redevelopment project. The Plaintiff and the Plaintiff’s husband P purchased two households from among the households that did not want to participate in the redevelopment project under the Plaintiff’s name, thereby participating in the said reconstruction project.

In addition, N demanded investment of KRW 500,000,00,000,00,00,000,000,000,000,000,00,000,000,000,000,000,000,000,000,000,000,000,000

C. On August 5, 2016, K grants to the Defendant joining the Defendant “2. K delivers the key to the Defendant joining the Defendant as to the five households of the reconstruction building (35 households) among the general sale of the reconstruction building (35 households), and possesses and manages it.

(On the other hand, five households out of the general allotment of the above reconstruction building shall be designated by the Defendant joining the Defendant at the same time, and possession shall take place at the same time, and possession shall take place from K until the agreed amount is received). 3. The payment date of the above rebuilding building shall be from K until August 4, 2017.

The letter of performance (hereinafter referred to as “instant letter of performance”) was prepared and delivered, and N jointly and severally guaranteed the above obligation of K. D. On February 8, 2018, K bears the Defendant’s Intervenor’s Intervenor “Sdong and Tdong.”