손해배상(기)
1. The Defendant’s KRW 34,936,259 for the Plaintiff and KRW 5% per annum from September 6, 2013 to May 19, 2014.
1. The following facts may be found either in dispute between the parties or in full view of Gap evidence Nos. 1, 2, 3, 4, 7, 8, 15, 16, 17 (including paper numbers), Eul evidence Nos. 6 and 7, the result of the request to the appraiser B for the appraisal of defects, the result of the request to the appraiser C for the appraisal of defects, and the overall purport of the pleadings.
On January 4, 2008, the Plaintiff entered into a contract with the Defendant to establish and lease a logistics warehouse (hereinafter “instant warehouse”) on the ground of Ansan-si D, setting the construction cost of KRW 286,00,000, and the construction period of the said construction (hereinafter “instant construction”) from February 1, 2008 to January 10, 2009.
B. The Defendant performed the instant construction pursuant to the instant contract and completed the instant construction within the time limit for completion stipulated in the said contract. On January 19, 2009, the Defendant obtained approval for the use of the instant warehouse from the Ansan Market.
C. However, since spring spring in 2009, mining plates installed by the Defendant on the roof of the warehouse of this case were destroyed, and water leakage occurred from the roof, and in 2010, some of the stuffing strings (the finishing materials installed at the intersecting point of walls and roof bonds) came to wind.
The mining board installed in the warehouse of this case is confirmed to be damaged in the whole area. This is due to the fact that the thickness of the mining board installed in the warehouse of this case is upper than 1.2m and lower than that of the light board ordinarily used (1.5m, lower part 1.2m, lower part 1.2m) and there should be aggregate (afterward) which combines the direction and lower part with the lower part at the time of construction. It is attributable to the Defendant’s use of materials that fall short of the standard, such as dancing in the plle and use of wrong methods of construction.
E. In addition, gambling, which was constructed in the warehouse of this case, has been abandoned in various parts, and the fixedness has been properly fixed.