beta
(영문) 특허법원 2015.11.19 2015허2440

권리범위확인(특)

Text

1. Paragraph 1 of Article 1 of the Patent Tribunal’s decision on March 31, 2015 regarding the instant case No. 2014Dang2735, the claims for the C invention.

Reasons

1. Basic facts

A. On October 30, 2014, the Plaintiff: (a) the invention subject to confirmation against the Defendant at the Intellectual Property Tribunal (the description and drawings are as shown in the attached Form) on October 30, 2014.

(2) On March 31, 2015, the Intellectual Property Tribunal rendered a trial decision on the confirmation of the scope of right of the instant patent invention by asserting that the instant invention does not fall under the scope of right, and that the instant invention falls under the claims 1 and 2, and does not fall under the claims 3 through 6.

B. The title of the invention of this case (Evidence 2) 1)/ the filing date of the registration date / registration number: F deck rate refers to the term “F deck rate” means the structure where a concrete production is removed. Spanish space of the patented invention of this case is installed between a string before concrete burning and a stringer formed in the ceiling and installed at the bottom of the ceiling, which is a structure that facilitates the installation of various facilities in the process of the 0th of the 0th of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 2nd of the 3th of the 2nd of the 2nd of the 3th of the 2nd of the 2nd of the 3th of the indoor.