설계용역대금 등 청구의 소
1. The defendant's KRW 617,786,400 and its portion
(a) From February 22, 2017, for KRW 120,572,400, 444,700.
A. As to the construction of an officetel, the contract amount was KRW 654,00,000 (excluding value-added tax) (hereinafter “instant second design service contract”) and the design service contract was concluded.
The main contents of the above contract are as follows:
Article 3 (Scope of Services) The scope of services to be rendered by the Plaintiff to the Defendant is as follows:
1. Building design-planed design, interim design, and shop design;
2. Structural design;
3. Civil engineering design (civil engineering in a complex);
4. Design of machinery and equipment (including fire-fighting);
5. Design for electric facilities (including fire-fighting);
6. Article 4 (Method of Calculation and Payment of Service Charges) (1) The standards and method of calculation of service charges shall be based on the price standards;
(1) (3) In the event of installment payments, in principle, the payment time and amount shall be as follows:
At the time of completion of deliberation on the non-fixed amount of payment, the sum 65,000,000 of the Won 100,000,000 after the completion of approval of the project after approval of the project, the sum 654,00,000 of the Won Won 489,000,000 and at the same time with the loan implementation * Article 18 (Payments Payment at the time of discontinuance of design business) separate from value-added tax * If all or part of the design business has been interrupted due to the reasons attributable to the defendant, the defendant shall pay the money until the suspension
(2) The consideration for duties performed by the time of suspension shall be computed based on consideration standards.
B) The Plaintiff and the Defendant, on November 1, 2016, entered into a design contract for the construction of a new apartment house with J as the site for the construction of a new apartment house at Seopo-si, Seopo-si, Seopo-si, Seopo-si, Seopo-si, with the contract amount of KRW 100,00,000 (value-added tax exemption) (hereinafter “third design contract”).
A) A design service contract with the contract amount of KRW 70,000,000 (value-added tax exemption) for a newly built house in the land of K, L, and M in Seopo-si on the same day (hereinafter “instant design service contract”).
AB concluded the agreement.
Each of the above.