beta
(영문) 전주지방법원군산지원 2015.06.09 2014가단12961

유체동산반환

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. The plaintiff's assertion that he received the building materials leased to the plaintiff at two sites of military transportation Dong Dong-dong, and brought them together with the building materials listed in the separate sheet owned by the plaintiff. Thus, the plaintiff seeks to deliver the above building materials to the defendant.

2. Each statement of evidence Nos. 1 through 3 alone is insufficient to recognize that construction materials listed in the separate sheet as the Plaintiff’s ownership, and there is no other evidence to acknowledge this otherwise, the Plaintiff’s assertion is without merit without further review.

3. The plaintiff's claim is dismissed as it is without merit.