담장철거 등
1. The defendant shall be the plaintiff.
A. Of the 11m2 in Chuncheon-si, the annexed codes are linked in order to each point indicated in the 2, 6m2.
1. Facts of recognition;
A. On March 5, 2015, the Plaintiff purchased 11 square meters in Chuncheon-si (hereinafter “instant land No. 1”) and D large 363 square meters (hereinafter “instant land”) from E, and completed the registration of ownership transfer as to the said land on the same day (hereinafter “instant land”).
B. On July 14, 2015, the Defendant completed the registration of ownership transfer with respect to the building with F. F. 195 square meters adjacent to the instant land and if the instant building is located on the ground, ice colon colon 4 (hereinafter “instant building”).
C. However, among the block brick fences of the instant building, the part on the line connecting each point of the separate marks Nos. 2 and 6 are on the land of this case. The Defendant occupies a part of 5 square meters in the ship which connects the same codes No. 1, 2, 6, and 1 in sequence.
In addition, among the fences of the building of this case, the portion on the line connected with each point of 17, 18, 19 of the attached Table 20, 2, 21, 22, 19, and the part on the warehouse of the "colc" part of the warehouse of this case, which are connected in order to each point of 20, 21, 22, 22, 19, and 20 are on the land of this case 2. The defendant occupies the part on the "bolc" part of the wall of this case, which connects each point of 17, 20, 20, 21, 21, 3, 24, 23, 22, 19, 18, and 17 of the same appraisal
[Reasons for Recognition: Facts without dispute, entries in Gap evidence 3 and 4 (including the paper number), the result of each survey and appraisal, the purport of the whole pleadings]
2. According to the above facts finding as to the cause of the claim, the defendant removed the brick fence fence connected to the plaintiff in order to indicate 2 and 6 marks in the attached Form 1 among the land in this case, and delivers 5 square meters per ebb "bbb" part of the "b" to the plaintiff, which connected in sequence 1, 2, 6, and 1 in order to indicate the same code. Of the land in this case No. 2, the attached appraisal in the attached Form 17, 18, 19 shall be attached in sequence 20, 2, 21, 22, 19, and 20 each point of 6 square meters and 22, 23, and 24 shall be attached in order.