(영문) 서울동부지방법원 2021.01.22 2018가단140044

공사대금

Text

The plaintiff's claim is dismissed.

Litigation costs shall be borne by the plaintiff.

Reasons

1. The Plaintiff, on January 22, 2018, paid only KRW 411,100,00,00,00 for the additional construction work (i.e., the additional construction work of KRW 42,00,000 for the additional installation work of KRW 42,00,000, while performing the construction work under a contract with the Defendant for the interior construction work of KRW 363,00,00 for the fifth floor of the building C in the Government-si, the Defendant was obligated to pay only KRW 294,00,00,00 for the remainder of the construction work (i.e., the additional installation work of KRW 42,00,000 for the additional installation work of KRW 41,10,000 for the Defendant, but the Defendant paid only KRW 294,00,000 for the remainder of the construction work cost (= the additional construction cost of KRW 411,00,000).

The argument is asserted.

However, the evidence presented by the Plaintiff alone is insufficient to recognize that the Plaintiff completed the construction as alleged by the Plaintiff or performed the construction work corresponding to the construction cost, and there is no other evidence to acknowledge this otherwise, the Plaintiff’s claim is without merit.

2. In conclusion, the plaintiff's claim is dismissed as it is without merit. It is so decided as per Disposition.