beta
(영문) 서울중앙지방법원 2020.12.10 2019가단5037765

구상금

Text

1. Defendant B and C shall jointly serve as KRW 33,130,000 for the Plaintiff and as a result, from September 14, 2016 to September 9, 2019.

Reasons

1. Facts of recognition;

A. On October 1, 2015, the Plaintiff entered into a comprehensive automobile insurance contract with F (hereinafter “instant insurance contract”) with respect to the G vehicle owned by F (hereinafter “Plaintiff”) with the term of insurance “from October 1, 2015 to October 1, 2016,” the term of insurance, including “personal compensation 1, personal compensation 2, personal compensation, property compensation, and self-motor vehicle damage” (hereinafter “instant insurance contract”).

B. H (hereinafter “H”) leased a building on the ground of the Jung-gu Incheon Metropolitan Government J (hereinafter “instant building”) from Company I, and on February 1, 2016, Defendant B subleted part of the instant building (hereinafter “instant small side workplace”) to Defendant B as security deposit 17,00,000, monthly rent 2,200,000, and 12 months for the period.

C. On June 1, 2016, Defendant C took over and operated the instant small-sized shop from Defendant B. On August 20, 2016, the occurrence of a fire in the instant small-sized shop on August 20, 2016, and the instant building was partially destroyed and the Plaintiff’s vehicle, which was incurred for repairing the instant small-sized shop, suffered damage to the front vehicle.

hereinafter referred to as "the fire of this case"

D. Defendant C, at the instant small-sized shop on the date of the instant fire, used a string of a string of a string of a string of a string of a string of a string of a string of a string of a string of a string of a string of a string of a car, and

After the same day, Defendant C sent out for a meal room at around 20:10 on the same day, but returned to the workplace at around 21:58, and observed the instant fire.

E. In addition, Defendant D entered the small workplace of this case at around 17:00 on the date of the instant fire at Defendant C’s request, and used the strawer from outside the building to 18:00 to use the stringer and stringer inside the building.