특정범죄가중처벌등에관한법률위반(절도)
Defendant
A Imprisonment for two years, for one year and six months, for Defendant B, and for Defendant C, for one year and six months, respectively.
(b).
Punishment of the crime
[Criminal Justice] On August 10, 2010, Defendant A was sentenced to a suspended sentence of six months for larceny, etc. at the Daegu District Court.
On June 21, 2011, the Daejeon District Court sentenced three months of imprisonment for attempted larceny at the Daejeon District Court on July 9, 201 and completed the execution of the sentence in the Daejeon Prison on July 9, 201.
【Criminal Facts】
Defendant
A over 31 times, Defendant B had been stolen of the victims habitually over 29 times, and Defendant C had been stolen over 15 times as follows:
1. From August 9, 2012 to October 30, 2012, the Defendants intruded into the building through the entrance of the Jungwon-gun, which was not corrected in excess of a fenced from the building in the building of the Jungwon-gun, which was managed by the victim F of the victim F in Chungcheongnam-si, Chungcheongnam-si, and then cut the old electric wires of an amounting to KRW 420,000 at the market price of each floor toilets and the boiler room into the towing, cutting, cutting, and cutting the 60K electric wires in advance from each floor toilets and the boiler room, and then cut the victim’s property jointly and severally, and then cut the victim’s property. From that time to October 30, 2012, the Defendants jointly cut off the old electric wires of an amounting to KRW 3,75,000,000, totaling 111 times as indicated in the annexed crime list No. 8 through 13,15,16,18 through 20.
2. On July 3, 2012, Defendant A and Defendant B intruded into the building through the entrance of the Jungwon-gun, which was managed by the victim F of the victim F in Chungcheongnam-dong on July 22, 2012, and was not corrected beyond the fenced, and then cut and dismantled in each floor toilets and the boiler room of the lower level of 70,00 KK at the temperature of 20 KK at the market price of 210,000, and then cut and dismantled in a string line of 30 KK at the market price of 20,000, in advance at each floor toilets and the boiler room of the lower level of 20,000, and then cut and dismantled the victim’s property in combination with it, and then cut off the victim’s property from around that point to May 3, 2013.