손해배상(자)
1. The manager B of the Gwangju Shipbuilding Co., Ltd., Ltd., the Defendant Rehabilitation Co., Ltd., was the Plaintiff at KRW 77,900,000 and the Plaintiff on January 2013.
1. Grounds for liability for damages;
A. (1) In fact, the Plaintiff (mutual : C) is the owner of the 110 tons weighting machine of Type D 110 tons (hereinafter “damage miding machine”) and the owner of the 100 tons weighting machine of Type E (hereinafter “the 100 tons weighting machine”) and the 3-ray Co., Ltd. is the owner of the 100 tons weighting machine of Type E (hereinafter “the 3-raying machine”). On December 21, 2012, prior to the occurrence of the following accident, the 3-ray Co., Ltd. was decided to commence rehabilitation procedures by the Gwangju District Court 2012 Ma44, the Gwangju District Court 2012, and appointed B as the manager (hereinafter “Defendant 3”).
On January 23, 2013, the Defendants’ Intervenor (hereinafter “ Intervenor”) entered into a contract for the lease of the said Defendant’s subsidiaries. Accordingly, the aforementioned Defendant’s Defendant’s workplace (i.e., 1255 Sinpo-dong 1255) required two mid-term and two drivers to dismantle and transport the workshops installed in the said Defendant’s workplace (i.e., Sinpo-dong 1255). At the Intervenor’s request in charge of the dismantling work, the above Defendant’s sea-going machine (i.e., throwing out the list, etc. of the demolisheds on the ground) and the Plaintiff’s damaged mid-term equipment (i.e., carrying the list, etc. issued on the ground by the sea-going equipment) were put into the transport site on January 28, 2013.
In the process of operating a boom flag at the time of the above work, F belonging to Defendant Slight Shipbuilding changed to a point of three to four meters from the scheduled location to be lowered on the ground by booming the steel structure, which is a boom, according to the participant's personnel's reception. In this case, if boom booms are installed by the height of steel structure in the future, it is likely that if the boom boom booms are boomed by the height of steel structure, boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom boom