(영문) 부산지방법원 2015.12.17 2014가합12013

손해배상(기)

Text

1. The Defendant’s KRW 43,570,163 as well as the Plaintiff’s annual rate from September 13, 2014 to December 17, 2015.

Reasons

Basic Facts

A. On September 28, 2010, the Plaintiff, a corporation that is engaged in the shipbuilding industry, machinery, plant manufacturing business, etc., is a corporation that acquires and uses the ownership of the building on the ground (hereinafter “each of the instant buildings”) 255 square meters per annum 255 m3,518 m27 m2,218 m2, 337 m2,218 m2, 255 m25 m25 m27, 278, 339-4, 340-2, 342-2, 342-2, 342, 337, 340, 339-2, 342-2, 342 m2, 337, 339-2, 341 and 342 of the same year.

B. On November 201, the Defendant, a corporation operating a construction business, etc., and a blasting work between April 201 and December 201, when the mobilization and development of a stock company (hereinafter “colation and development”) subcontracted blasting work among the construction works for the construction works for the projects for the creation of the Dobong General Industrial Complex, which was conducted at the salary 98-1 Japanese Won in the vicinity of each of the instant land, was conducted (hereinafter “instant blasting work”).

C. At the Defendant’s request, the prior investigation report (No. 2) prepared by Ajin Engineering Co., Ltd. after investigating each building of this case from May 3, 2013 to October 31, 2013 (the evidence No. 2) stated that “the building of this case is in the state that there was no serious defect and fatal damage to structural safety as a result of the shore survey, and that some damage such as rupture, rupture, rupture, damage to net rupture, destruction, steel corrosion, and V corrosion that require partial remuneration for the increase of durability and usage was investigated, and that appropriate remuneration measures should be taken in order to secure the long-term internal structure, use and aesthetic view.”

At the request of the Plaintiff, the investigation report (Evidence A 3) prepared by the professional structural engineer B of the A-Building Professional Engineer Office after investigating each of the buildings of this case from June 11, 2014 to July 7, 2014 by the professional structural engineer B of the A-Building Professional Engineer Office shall include the results of the investigation and measurement of the land of this case.