(영문) 대구지방법원 서부지원 2012.12.07 2012고정517

업무상실화

Text

The defendant shall be innocent.

Reasons

1. The summary of the facts charged is the person who is engaged in managing the (State) D Technical Director in Daegu-gu, and all the construction sites in the implementation of the said D.

From October 1, 2009, the Defendant had applied for temporary power termination on March 12, 2010 when the construction of parking buildings in Daegu-gu, Daegu-gu, applied for temporary power installation to the Korean power and used the power as a parking lot for e-mail cargo vehicles while the construction of parking buildings was suspended. The Defendant applied for temporary power termination on March 12, 2010, and the Korean power collected temporary power measuring instruments.

In such cases, the Defendant had a duty of care to remove electric wires connected from the electric poles of Korean power to the construction site measuring instruments (hereinafter “instant electric wires”) after the removal of measuring instruments and prevent the occurrence of fire due to electric leakage, etc. in advance.

Nevertheless, the Defendant neglected this and did not remove electric wires connected to the construction site to the end of the instant electric wires, and did not remove them on March 9, 201, at around 12:37, 201, at the end of the instant electric wires, and the instant electric wires, which were loaded only the exhaust tape, are faced with the G external wall panel of the victim F in a strong wind, while the instant electric wires, which were cut off by the exhaust tape and was skeed by the strong wind, were destroyed, and the flame was stuck back to the paper string in a space between the e-mail truck parking lot and the G space, and loaded them into G panel, etc., outer walls, equipment, fixtures, office fixtures, fixtures, and drinking stairs loaded into drinking stairs, etc.

Ultimately, the Defendant, by negligence in the above occupational negligence, destroyed the amount of KRW 120,952,764 of the building, such as the outer wall panel owned by the victim, KRW 18,605,401, KRW 1,086,855, KRW 51,640,572 of the market price, such as beverages, beverages, and daily necessities, and KRW 192,285,592 of the market price.

2...