업무상과실치사등
Defendant
A In 8 months of imprisonment, Defendant B is punished by a fine of KRW 5 million, and Defendant C is punished by a fine of KRW 7 million.
Punishment of the crime
Defendant
C A corporation is a corporation that has its head office in Gangseo-gu Seoul Metropolitan Government F and employs four full-time workers for the purpose of civil engineering and construction business, etc., and is a business owner who was awarded contract for KRW 2,842,143,000 from the Gangseo-gu branch office of the Korea Rural Community Corporation and the Chuncheon branch office for KRW 2,842,143,00.
Defendant
A is a director at the site of the construction site of the construction site of this case who is a general manager of safety and health.
Defendant
B is an agent for the Korea Rural Community Corporation, which is a contractor for the instant construction project, who is in charge of supervising repair facilities opening and repair projects.
1. On December 14, 2017, Defendant A’s occupational injury and death, violation of the Industrial Safety and Health Act, and Defendant B’s occupational injury and death, etc., caused Defendant A to do a dynamics of a wall retaining stairs in order to prevent dynamics of the wall at the site of the instant construction work located in Hongcheon-gun, Hongcheon-gun. Accordingly, the victim I (5 years of age) and J, and K engaged in the instant construction work, together with the victim I (5 years of age), J, and K had the retaining wall of concrete stairs covered outside of the wall of stairs under Articles 5 and 6 of the retaining wall of concrete stairs.
At this point, it is a vertical retaining wall with a height of 9 meters, and each stairs width is over 0.9-1.2 meters, and there is a danger that workers who are going on the stairs might fall down. In such a case, Defendant A, an on-site agent safety and health supervisor, is obliged to provide workers with protective equipment, such as safety caps, and instruct and supervise them to wear them, and to take protective measures to prevent danger in advance by installing a strong structure with sufficient strength, such as safety rail, fence, fall prevention objects, etc.
In addition, Defendant B, the supervisor of the construction of the instant case, is unable to perform safety education for workers, installation of safety facilities, etc., shall instruct the correction thereof, and the construction works shall follow the corrective direction.