beta
(영문) 서울중앙지방법원 2017.08.11 2015가단5396114

손해배상(자)

Text

1. The Defendant’s KRW 27,045,98 as well as the Plaintiff’s annual rate from September 23, 2012 to August 11, 2017.

Reasons

1. Occurrence of liability for damages;

A. On September 23, 2012, B: (a) the vehicle C on September 23, 2012 (hereinafter “Defendant vehicle”);

A) While driving the U.S. and driving the U.S. national expressway into the Incheon bank from the Gangnam bank area, both IC was at a point of 173.9 km at the point of 173.9km from the front part of the Defendant vehicle (hereinafter “instant accident”).

(2) Due to the instant accident, the Plaintiff suffered injury to the escape of the conical signboard No. 4-5. On February 20, 2014, the Plaintiff got an operation to remove conical signboards and inserting artificial disks (hereinafter “instant operation”).

3) The Defendant is an insurer who entered into an automobile comprehensive insurance contract with the Defendant’s vehicle. The Defendant is an insurer who entered into an automobile comprehensive insurance contract. The fact that there is no dispute over grounds for recognition, Gap’s evidence Nos. 1, 2, and Eul

B. According to the fact of recognition of liability, the Plaintiff sustained injury due to the operation of the Defendant’s vehicle, barring any special circumstance, the Defendant is liable for compensating the Plaintiff for the damages caused by the instant accident as an insurer of the Defendant’s vehicle.

2. In addition to the matters stated below within the scope of liability for damages, each of the corresponding items of the Schedule of Calculation of Compensation for Damages shall be as follows, and in principle, the period for the convenience of calculation shall be calculated monthly, but less than the last month and less than KRW 1 shall be discarded.

The calculation of the current value at the time of the accident shall be based on the reduction rate of 5/12 percent per month to deduct the interim interest.

In addition, it is rejected that the parties' arguments are not stated separately.

Personal information 1) Personal data: as stated in the “basic matters” list of damages calculation sheet: income and operating period: urban daily wage (22 days of operation per month), after the ordinary worker reaches 60 years of age, 3) residual disability and aftermath disability (a rate of loss of work ability) in the ordinary worker’s workplace, 1) after the instant accident, and the aftermath disability (a rate of loss of work ability after the instant accident: light after the instant accident: