(영문) 창원지방법원 2020.09.17 2019가합52570

공사대금

Text

1. The Defendant’s KRW 172,784,772 as well as the Plaintiff’s annual rate from May 20, 2019 to September 17, 2020, respectively.

Reasons

1. Basic facts

A. The plaintiff is a company running electrical construction business, etc. and the defendant (the former trade name corporation: C) is a company running construction business, etc.

B. The Plaintiff and the Defendant entered into a subcontract for construction works with the content indicated in the table 1 below.

(1) The following construction works are reflected in the terms and conditions of the contract between the plaintiff and the defendant; hereinafter 2. 8: 0. 2. 1 ; 3. 4 ; 0. 2 ; 0. 4 ; 0. 5 ; 20. 8 ; 3. 1 ; 0. 4 ; 5 ; 20. 8 ; 1. 6 ; 3. 4 ; 0. 6 ; 10 ; 3. 5 ; 4. 20 ; 5 ; 20 ; 3. 8 ; 10. 6 ; 40 ; 3. 5 ; 400 ; 30. 5 ; 106 ; 30. 6.20 ; 16. 720 ; 106. ; 36. 720 ; 205 ;

However, as shown below, the subcontract price balance is KRW 92,784,772.