공사대금
1. The Defendant’s KRW 172,784,772 as well as the Plaintiff’s annual rate from May 20, 2019 to September 17, 2020, respectively.
1. Basic facts
A. The plaintiff is a company running electrical construction business, etc. and the defendant (the former trade name corporation: C) is a company running construction business, etc.
B. The Plaintiff and the Defendant entered into a subcontract for construction works with the content indicated in the table 1 below.
(1) The following construction works are reflected in the terms and conditions of the contract between the plaintiff and the defendant; hereinafter 2. 8: 0. 2. 1 ; 3. 4 ; 0. 2 ; 0. 4 ; 0. 5 ; 20. 8 ; 3. 1 ; 0. 4 ; 5 ; 20. 8 ; 1. 6 ; 3. 4 ; 0. 6 ; 10 ; 3. 5 ; 4. 20 ; 5 ; 20 ; 3. 8 ; 10. 6 ; 40 ; 3. 5 ; 400 ; 30. 5 ; 106 ; 30. 6.20 ; 16. 720 ; 106. ; 36. 720 ; 205 ;
However, as shown below, the subcontract price balance is KRW 92,784,772.