beta
(영문) 대전지방법원 2017.11.21 2016가단217083

손해배상(기)

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Defendant is a new material LFT LFT Lbreed Liber Lbryst Liber, long breination balance, WLFT Wloven-L long-Lbber reination balance development company, which is used for the production of sloping beam.

Mona Automobile Co., Ltd, focusing on the Defendant's new materials and sex techniques, tried to cooperate in the development of products that can substitute lux plastics with GMT Glass Mathotics and enhanced glass fibres.

B. On April 25, 2007, the Defendant entered into a technical service contract (hereinafter “instant technical service contract”) with the Plaintiff, who had the structure design and interpretation technology of the sn beam products on July 16, 2007, ordering the sn beamline development of low voltages of sn beams” to perform the service, and entered into a joint agreement on investment and project (hereinafter “instant contract”).

The main contents of the instant contract are as follows.

The Defendant and the Plaintiff, using the Defendant’s location (LFT, WLFT), intend to enter into this contract for the performance of and for technical investment in common LFT/WLFT Baccck Back projects and for the purpose of developing and selling back the white beamline (REAR Back Back Back Back), on condition that this contract satisfies the performance test of CMVS CMFS CFS Cira Mocle Safet Sck Back Back Back Backs (REAR Backbk Ba) after the fifth day after the 5th day of safety standards of the Canada federal vehicle.

The purpose of this contract is to secure the supply of contract products using the defendant's materials in September 2007, through research and development that combines the defendant's location and shape technology and the plaintiff's structural design and interpretation technology for the development of the REAR Bak Bak Bag and its mass production.

2. Object.